Popular Long Stroke Double Acting Hydraulic Piston Cylinder
$133-12219 /set
Payment Type: | L/C,D/P,D/A,T/T,MoneyGram |
Incoterm: | FOB,CIF,EXW |
Min. Order: | 1 set |
Transportation: | Ocean,Land,Air,Express |
Port: | Shanghai |
$133-12219 /set
Payment Type: | L/C,D/P,D/A,T/T,MoneyGram |
Incoterm: | FOB,CIF,EXW |
Min. Order: | 1 set |
Transportation: | Ocean,Land,Air,Express |
Port: | Shanghai |
Brand: JOBA
Warranty: 1 years
Customized Support: OEM, ODM
Brand Name: JOBA
Model Number: JRR/FCD
Type: Hydraulic Jack
Min Height: 247mm
Max Height: 323mm
Capacity (Load): >50T
Product Name: Double Acting Cylinder, Large Tonnage Cylinder
Condition: New
Machinery Test Report: Provided
Core Components: Piston Cylinder
Body Material: Steel
Stroke: 100-500mm
Power: Hydraulic
Max Pressure: 700bar
MOQ: 1 PC
Certification: Gs
Place Of Origin: China
Species: Hydraulic Jack
Maximum Load: ≫50t
Place Of Origin: Jiangsu, China
Certificate: CE &ISO
Selling Units | : | set |
Package Type | : | Wooden case |
If the oil in the pump body is insufficient, it is necessary to add working oil to the pump before it can work. Estimate the weight, and avoid overloading. Select the jack's focus point to ensure that the center of gravity of the lifting object is perpendicular to the top surface of the jack. At the same time, it is necessary to consider whether the ground is soft and hard and whether it is padded with tough wood, so as to avoid the danger of tipping during lifting.
After the jack lifts the heavy object, the heavy object should be supported with tough wood in time. It is forbidden to use the jack as a support. If there is no special device, it is forbidden to use several jacks at the same time, so as to avoid the unbalanced load and the danger of dumping. When using, first connect the quick connector of the manual pump to the top, then select the position, and tighten the oil drain screw on the oil pump to work. Loosen the oil drain screw and unload the oil cylinder.
1. Synchronous hydraulic jack: sync lifting support construction for a long time and synchronous moving of bridges. |
2. Pile foundation test: used for large-tonnage pile foundation testing. |
3. Bridge top push, move: synchronous displacement of bridges. |
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.